Permit submission, inspections, and certificate of occupancy coordination — managed end to end by our team. You focus on the build; we handle the paperwork.
Why It Matters
Florida permitting can stretch months, sometimes years — especially in coastal jurisdictions with strict hurricane codes. A misfiled drawing, a missed inspection, a single dismissive jurisdiction clerk can add weeks to your timeline.
We've been navigating Florida Building Commission and Georgia permitting since 1984. We know which jurisdictions are fast, which ones demand specific documentation, and how to get inspections scheduled on your timeline.
You get a structure that's safe, up to code, insurable, and ready for resale — without wasting a day on city hall.
What's Included
Every building erection project includes these capabilities as standard — no hidden scope, no surprise change orders.
Every drawing submitted to Florida jurisdictions carries Florida Building Commission approval — the gold standard for hurricane-rated construction.
We package your full permit application: stamped drawings, specifications, structural calcs, and all required supporting documents.
We've worked with dozens of Florida and Georgia jurisdictions. We know which ones want what, and we make sure submittals land right the first time.
We schedule inspections, meet inspectors on-site, and handle any corrections or re-inspections needed — so your project keeps moving.
Need a setback variance, height variance, or special use permit? We handle the application, testimony, and hearing coordination.
We don't stop at construction — we see the project through final CO so your building is insurable and ready to use on day one.
Five phases. Jurisdiction-level accountability.
Get a QuoteEvery jurisdiction has quirks. We research local code requirements, setback rules, and recent ordinance changes before we submit anything.
Stamped drawings, structural calcs, site plan, specs — we assemble the complete package the jurisdiction wants, in the format they want it.
We submit, track, and respond to any review comments. If the jurisdiction needs clarifications, our engineers respond within the day.
We schedule and attend every required inspection — foundation, framing, final — so nothing stalls your build.
We see the project through CO issuance so your building is legally occupiable, insurable, and ready for operation.
Common Questions
Answers to the questions contractors and owners ask most often about building erection.
Have a question we didn't cover?
Contact UsFrom your first call to your certificate of occupancy — we manufacture, engineer, permit, and erect your steel building in-house. No middlemen. No markups. Get a free quote from our team today.
Free Estimate
Tell us about your project and we'll be in touch within one business day.