Building Erection.
Done Right, The First Time.

Trained crews. On time. Within budget. We don't leave until the job is done right — because we're the ones who manufactured, engineered, and will warranty the building.

0
Sq Ft in One Week
0
Faster Than Conventional
0
Production Facilities

Why It Matters

Erection is where pre-engineered steel pays off.

A properly engineered and manufactured steel building only delivers on its promise if it's erected by crews who know what they're doing. We've spent 40+ years raising structures across Florida, Georgia, and the broader Southeast — and we bring that experience to every job.

Because we manufacture the panels ourselves and engineer the structure in-house, our erection crews know the product inside and out. There's no finger-pointing between the engineer, the manufacturer, and the erector — because all three are us.

That's why General Contractors, developers, and business owners come back to us project after project. One point of contact. One accountable team. One standard.

What's Included

Capabilities & Deliverables

Every building erection project includes these capabilities as standard — no hidden scope, no surprise change orders.

Full Project Coordination

From foundation prep to final inspection, we coordinate every phase — concrete, steel, subs, and the jurisdiction — so you have one phone number to call.

5,000 Sq Ft in ~1 Week

Pre-engineered steel erects roughly 75% faster than conventional construction. 5,000 sq ft raised, weathered-in, and ready for interior work in approximately one week.

On-Time Delivery Guarantee

We don't quote schedules we can't keep. Our estimates are built around real crew capacity and real production timelines — not best-case scenarios.

Experienced, Trained Crews

Metalworking is a skilled trade. Our erectors are employed directly — not subcontracted — so the same crews work project after project, year after year.

Southeast Market Knowledge

Every jurisdiction has quirks — wind load zones, FBC requirements, inspection sequences. We've worked in all of them, so we don't make rookie mistakes.

Workmanship Warranty

Every building we erect carries a workmanship warranty backed by 40 years in the industry. If something isn't right, we come back and make it right.

Our Process

Here’s exactly how we do building erection.

Five phases. Clear handoffs. No surprises.

Get a Quote
01
Site Prep & Foundation

We lay the base

We coordinate (or execute) foundation work — concrete, anchor bolts, slab — with specs engineered for your exact building.

02
Steel Delivery

Members arrive on schedule

Primary structural members delivered from our Tampa or Adel facility — no middleman delays.

03
Frame Erection

Columns, rafters, girts up first

Our crews typically complete a 5,000 sq ft frame in 3–4 days — structure raised and ready for panels.

04
Panel Installation

Roof first, then walls

Building weathers-in fast so interior trades can start immediately — no weather delays to your schedule.

05
Trim, Accessories & Final

Keys in your hand

Downspouts, gutters, doors, windows, and accessories installed. Final walkthrough with you before we hand over the keys.

Common Questions

Frequently Asked

Answers to the questions contractors and owners ask most often about building erection.

For a standard 5,000 sq ft warehouse or commercial structure, our crews complete erection in approximately one week — frame, roof panels, and wall panels. Larger or more complex buildings scale from there. We'll give you a realistic, calendar-specific timeline as part of your quote.
Yes. We either execute the foundation directly or coordinate it with a concrete sub we've worked with. Either way, we manage the interface between foundation and steel so anchor bolts, slab elevations, and tolerances are exactly right.
In most cases, yes — but our engineering team first verifies the existing foundation can accept the loads of the new structure. If modifications are needed (anchor retrofits, slab edge thickening, etc.) we spec them in advance as part of the quote.
We build realistic buffer days into every schedule. For weather delays beyond normal, we'll work with you on adjusted timelines — but because we own the manufacturing and crews, we don't get pushed by someone else's backlog.
We focus primarily on erecting buildings from our own production facilities — that's how we can guarantee engineering, manufacturing, and erection all came from one accountable team. For existing buildings we didn't manufacture, our sister service — Repairs & Modifications — handles renovations and additions.

Have a question we didn't cover?

Contact Us

Start Your Project.
Done Right, The First Time.

From your first call to your certificate of occupancy — we manufacture, engineer, permit, and erect your steel building in-house. No middlemen. No markups. Get a free quote from our team today.

Get a Quote (800) 331-8341